Industry tank fram

Case Study

How we inspected a dual-diameter 10”–12” pipeline in a single run with ultrasonic ILI

Highlight

“Intero’s inspection reduced execution time by more than 75% while delivering exceptionally accurate results.” – Integrity Management Program Engineer

Pipeline Surveyor family 2

A 7,000 ft dual-diameter (10” and 12”) pipeline required inspection. Previous attempts by another provider needed two separate runs, which extended execution time, increased costs, and disrupted operations. The client needed a faster, more efficient, and more accurate solution.

Downloads & media

Download the Case Study